PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Plumbing material for the 3rd floor bathrooms Facing East (800x600).jpg Poured concrete at the 2nd half of the 4th Floor Facing East (800x600).jpg Welding clips at the North Elevation (2nd Floor)(800x600).jpg Started fireproofing the 2nd Floor Facing West (800x600).jpg Welding beam clips at the 2nd Floor East Elevation (800x600).jpg
Previous page Welding beam clips at the 2nd Floor East Elevation (800x600)
Welding beam clips at the 2nd Floor East Elevation (800x600)